**ALL BIJUR DELIMON ORDERS ARE SUBJECT TO $125.00 MINIMUM**

GLOBAL SOLUTIONS: We ship internationally and work with companies worldwide.

Watson Gloves

Watson Gloves 005TPC Flextime – Impact-Resistant Water-Resistant Cut-Resistant Work Gloves

(No reviews yet) Write a Review

Tracked & insured shipping

Free Returns

 

30 Days Money Back Guarantee

SKU:
005TPC-L
UPC:
065537865201
MPN:
005TPC-L
Condition:
New
Weight:
1.00 LBS
Shipping:
Calculated at Checkout
  • Watson Gloves 005TPC Flextime – Impact-Resistant Water-Resistant Cut-Resistant Work Gloves
  • Watson Gloves 005TPC Flextime – Impact-Resistant Water-Resistant Cut-Resistant Work Gloves
  • Watson Gloves 005TPC Flextime – Impact-Resistant Water-Resistant Cut-Resistant Work Gloves
  • Watson Gloves 005TPC Flextime – Impact-Resistant Water-Resistant Cut-Resistant Work Gloves
$37.64
Frequently bought together:

Description

Engineered for professionals who demand protection and comfort, the Watson Gloves 005TPC Flextime offers impact resistance, cut protection, and exceptional dexterity. Featuring a CutShield™ A5 liner, Dryhide™ full-grain goatskin leather, and a WasteNot™ recycled spandex back, these gloves deliver reliable durability and sustainability. Perfect for construction, industrial, and landscaping applications where hand safety is non-negotiable

View AllClose

Additional Information

Cut Level:
ANSI A5 / EN388 4X31B
Palm Material:
Dryhide™ Water-Resistant Full-Grain Goatskin Leather
Liner:
CutShield™ Para-aramid / Steel / Polyester
Back Material:
WasteNot™ Recycled Spandex
Impact Protection:
Heavy-duty TPR on back of hand and fingers
Touchscreen Compatibility:
Yes
Cuff:
Elastic wrist with Velcro® closure
Applications:
General Construction • Light/Medium Industrial • Landscaping
View AllClose